CPEC Projects (Package 2B & Package III)

Geotechnical Investigation and Piling Work

CPEC Projects (Package 2B & Package III)

For the CPEC Package 2B and III, EEA was responsible for drilling more than 100 boreholes and installing over 100 piles at a depth of 30 meters.

The project was part of Pakistan’s collaboration with China on the China-Pakistan Economic Corridor, a strategic infrastructure initiative. EEA’s work ensured the safety and longevity of the project’s bridges and other infrastructure.

Details
Piles installed 100+
Boreholes drilled 12
Location Various Pakistan
Project start 2017
Project finish 2017
Clients FWO ZKB Consultant NESPAK

Metro Bus Project (Peshawar Mor to Golra Mor)

Piling Work

Metro Bus Project (Peshawar Mor to Golra Mor)

In 2017, EEA carried out piling work for the extension of the Metro Bus line from Peshawar Mor to Golra Mor. The installation of more than 90 piles with diameters of 1000mm and 1200mm, each reaching a depth of 30 meters, was essential to support the bus line’s elevated structures.

The project aimed to improve urban mobility in Islamabad, benefiting thousands of commuters daily.

Details
Piles installed 90+
Pile dimensions 1000mm and 1200mm diameter 30 meters depth
Location Peshawar Mor to Golra Mor Islamabad
Project start 2017
Project finish 2017
Client NLC (National Logistics Cell)

Nouman Pura Bridge, Azad Kashmir

Geotechnical Investigation

Bridges in North Waziristan (USAID Funded)

This project was part of the USAID-funded initiative to rebuild North Waziristan’s infrastructure. EEA performed the geotechnical investigation for several bridges to ensure they could withstand the region’s challenging soil conditions.

The findings helped engineers design resilient structures that could support economic and transportation improvements in the area.

Details
Boreholes drilled 10
Location North Waziristan Pakistan
Project start 2018
Project finish 2018
Client FWO Consultant NESPAK
×