Geotechnical Investigation and Piling Work

CPEC Projects (Package 2B & Package III)

For the CPEC Package 2B and III, EEA was responsible for drilling more than 100 boreholes and installing over 100 piles at a depth of 30 meters.

The project was part of Pakistan’s collaboration with China on the China-Pakistan Economic Corridor, a strategic infrastructure initiative. EEA’s work ensured the safety and longevity of the project’s bridges and other infrastructure.

Details
Piles installed 100+
Boreholes drilled 12
Location Various Pakistan
Project start 2017
Project finish 2017
Clients FWO ZKB Consultant NESPAK
×